
FRP 41: Run Capacitor (C1) Replacement
AC Repair and Adjustment Procedures
196
Cray Research/Silicon Graphics Proprietary
HMM-168-A
C1 Installation
As mentioned previously, this procedure describes using a solder sleeve and heat
gun to connect the wires. However, you may also use a soldering iron, solder,
and electrical tape to connect the wires.
1.
Position the replacement capacitor and secure it with the nut.
2.
Solder each connection to the capacitor:
a. Strip and clean the ends of the wires that you will connect.
b. Slide heat shrink onto a wire.
c. Insert the wires in a solder sleeve.
d. Heat the solder sleeve with the heat gun.
e. Place the heat shrink over the solder sleeve and shrink the heat shrink.
3.
Return the cabinet to operation, and check blower function.
4.
Remove power from the cabinet again, then replace the panel that covers
the blower controller (SCR1).
5.
Close the WACS panel, then return the cabinet to operation.
6.
Close the front cabinet door.