Figure 29: Front RAID Controller Card Location (CPU Modules removed)
Card ejector lever (magnified view)
3
Location of front RAID card in dedicated
horizontal socket (view of the front
compartment shown with the CPU modules
removed)
1
Metal retainer plate securing screws
2
Replacing the Front RAID Supercap Unit
This server supports installation of up to two supercap units, one for a front RAID controller and one for a
rear RAID controller. The front supercap unit mounts to a bracket on the inner chassis wall, below the CPU
modules.
Cisco UCS C480 M5 Server Installation and Service Guide
68
Maintaining the Server
Replacing the Front RAID Supercap Unit
Содержание UCS C480 M5
Страница 30: ...Cisco UCS C480 M5 Server Installation and Service Guide 28 Installing the Server Accessing the System BIOS ...
Страница 134: ...Cisco UCS C480 M5 Server Installation and Service Guide 132 Server Specifications Server Specifications ...
Страница 162: ...Cisco UCS C480 M5 Server Installation and Service Guide 160 GPU Card Installation GPU Card Installation ...