A-30
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-23069-07
Appendix A Technical Specifications
Chassis Clearances
For two-post rack installations with center-mount brackets, the chassis requires the following clearances
(see
Figure A-19
):
•
Front clearance of 37 inches (94.0 cm) for both of the following:
–
Cabling area of 13.5 inches (34.3 cm) between the front of the posts (posts are 6 inches (15.2
cm) behind the front of the chassis)
–
Maintenance area of 26 inches (66.0 cm) in front of the cabling area for installing the chassis
and replacing modules.
Note
You might need to increase the maintenance area to accommodate a wide mechanical lift
used to move the chassis to or from the rack.
•
Rear clearance of 26 inches (66.0 cm) behind the chassis for cable management and for replacing
the fan modules and power supplies.
•
Side clearance of 11 inches (27.9 cm) for airflow on each side of the chassis.
6
Air intake from cold aisle for the supervisor,
fabric, and I/O modules
14
Chassis depth
7
Air exhaust to hot aisle for power supplies
15
Clearance required between the front of the
chassis and edge of cold aisle for the cable
management frames and the optional front
doors
8
Air exhaust to hot aisle for the supervisor,
fabric, and I/O modules
16
Front clearance required for installing the
chassis and replacing the modules
Содержание Nexus 7004
Страница 12: ...Contents xii Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Страница 19: ... xix Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Страница 22: ... xxii Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Страница 24: ...xxiv Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 7 New and Changed Information ...