10-35
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-23069-07
Chapter 10 Installing or Replacing Components
Installing an I/O Module
Step 18
Reconnect the console cable to the CONSOLE SERIAL PORT as explained in the
“Connecting to the
Console” section on page 7-2
.
Step 19
If the previous supervisor module was connected to an asynchronous device through a modem, connect
the modem cable to the COM1/AUX SERIAL PORT as explained in the
“Connecting to the Console”
section on page 7-2
.
Step 20
Reconnect the network management cable to the MGMT ETH port as explained in the
“Setting Up the
Management Interface” section on page 7-4
.
Step 21
Reconnect the CMP cable to the CMP MGMT ETH port as explained in the
“Connecting the Supervisor
CMP Port” section on page 7-5
.
Step 22
Verify that the module has 4 GB of memory by using the
system switchover
command to make the
downgraded module active and using the
show system resources
command.
Step 23
If you need to downgrade the other supervisor module to 4 GB (both modules must have the same amount
of memory), repeat Steps 2 through 21.
Step 24
Verify that the downgraded module has 4 GB of memory. If there are two supervisor modules installed
in the switch, use the
system switchover
command to make the downgraded module active, and then use
the
show system resources
command. If there is just one supervisor module installed in the switch, use
the
show system resources
command.
Step 25
If you need to downgrade another supervisor module to 4 GB (both supervisor modules in a switch with
two supervisors must have the same amount of memory), repeat Steps 2 through 24.
Installing an I/O Module
A Cisco Nexus 7004 switch has up to two I/O modules, a Cisco Nexus 7009 switch has up to seven I/O
modules, a Cisco Nexus 7010 switch has up to eight I/O modules, and a Cisco Nexus 7018 has up to 16
I/O modules. These modules are located on the front of the chassis. You can replace one of these modules
at a time while the switch is operating.
Note
If you are installing F2 I/O modules, all of the fabric modules in the switch must be Series 2 fabric
modules.
This section describes how to replace I/O modules and includes the following topics:
•
Required Tools, page 10-35
•
Installing a New I/O Module, page 10-35
Required Tools
You need a flat-blade or number 2 Phillips-head screwdriver to loosen or tighten the captive screws on
the I/O module.
Installing a New I/O Module
A Cisco Nexus 7000 Series switch includes one or more of the following types of I/O modules:
Содержание Nexus 7004
Страница 12: ...Contents xii Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Страница 19: ... xix Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Страница 22: ... xxii Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Страница 24: ...xxiv Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 7 New and Changed Information ...