8-23
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-23069-06
Appendix 8 Managing the Switch Hardware
Shutting Down Modules
Note
If you are powering on more fabric modules than allowed by the current maximum number of fabric
modules, then make sure that the fabric modules that you are powering on are installed in the first
n
fabric slots (slots 1 through
n
), power-on those modules with the
no poweroff xbar
command, and
change the maximum number of fabric modules to
n
(see the
“Changing the Amount of Power Reserved
for Fabric Modules” section on page 8-30
).
SUMMARY STEPS
1.
config t
2.
[
no
]
poweroff xbar
slot_number
Note
Alternatively, you can use the
out-of-service xbar
slot_number
command.
DETAILED STEPS
Shutting Down an I/O Module
To shut down an I/O module, use the
poweroff module
command to specify the slot with that module
as follows:
switch#
poweroff module
slot
When you are ready to power up the module, use the
no poweroff module
command.
SUMMARY STEPS
1.
config t
2.
[
no
]
poweroff module
slot_number
Command
Purpose
Step 1
config t
Example:
switch# config t
switch(config)#
Starts the global configuration mode.
Step 2
poweroff xbar
slot_number
Example:
switch(config)# poweroff xbar 1
switch(config)#
Powers off the specified fabric module in the switch.
no poweroff xbar
slot_number
Example:
switch(config)# no poweroff xbar 1
switch(config)#
Powers on the specified fabric module in the switch.
Содержание Nexus 7004
Страница 12: ...Contents xii Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Страница 19: ... xix Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Страница 22: ... xxii Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Страница 24: ...xxiv Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 7 New and Changed Information ...