10-7
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-23069-07
Chapter 10 Installing or Replacing Components
Replacing an AC Power Supply Unit During Operations
Step 8
Either replace the power supply unit or cover the empty power supply bay as follows:
•
If you are ready to replace the power supply unit, see the
“Installing a 6-kW or 7.5-kW AC Power
Supply Unit During Operations” section on page 10-7
.
•
If the power supply bay is to remain empty, install a blank power supply filler plate (Cisco part
number 800-28658-01) over the opening, and secure it with the captive screws.
Installing a 6-kW or 7.5-kW AC Power Supply Unit During Operations
After you remove an AC power supply, you can replace it with another power supply or replace it with
a blank plate until another power supply is available. If you need to install a DC power supply unit, see
the
“Installing a 6-kW DC Power Supply Unit During Operations” section on page 10-14
.
Warning
Hazardous voltage or energy is present on the backplane when the system is operating. Use caution
when servicing.
Statement 1034
To install an AC power supply unit while a Cisco Nexus 7000 Series switch is operating, follow these
steps:
Step 1
Unpack the replacement power supply unit and place it on an antistatic mat. If you are unpacking a 6-kW
power supply unit, you must also unpack one or two power cords. If you are unpacking a 7.5-kW power
supply unit, two power cords are already attached to the power supply unit.
1
Open the smaller of two boxes.
10
Fold the two narrow box flaps over the
padding.
2
Place a padding sheet on the bottom of the
box.
11
Fold the two wide box flaps over the narrow
flaps.
3
Place the partitions on top of the padding.
Make sure that the cutout sections are on top.
12
Tape the two wide flaps together using
packing tape.
4
Place thicker padding piece in the central slot,
with the groove side up.
13
Insert each end of the smaller box into a
padding block.
5
Place the power supply unit in an ESD bag.
14
Place the box and its padding blocks in the
larger box.
6
Place the bagged power supply unit in the
central partition slot. Make sure that the
extension of the front side fits into the
padding groove.
15
Fold the two narrow box flaps over the
padding blocks.
7
Coil each of the two power cables and place
each cable in a slot next to the power supply
unit.
16
Fold the two wide box flaps over the narrow
flaps.
8
Rotate both foldouts over the power supply
unit.
17
Tape the two wide flaps together using
packing tape.
9
Place a padding sheet on top of the partitions.
Содержание Nexus 7004
Страница 12: ...Contents xii Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Страница 19: ... xix Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Страница 22: ... xxii Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 07 ...
Страница 24: ...xxiv Cisco Nexus 7000 Series Hardware Installation and Reference Guide OL 23069 7 New and Changed Information ...