
134
Rockwell Automation Publication 1407-UM002B-EN-P - February 2019
Chapter 5
CGCM-DLR Unit Startup
VAR Control
Perform this test with the generator operating in parallel with a large power
source that is maintaining constant voltage.
Follow these steps to test the VAR control operation.
1.
Place the voltage control in Droop mode.
2.
To produce a constant power of approximately 25% of rated output, adjust
the prime mover.
3.
Verify that the VAR setpoint is adjusted to the produced VARs.
In the following step, be prepared to transfer back to AVR Droop mode if
the excitation increases or decreases suddenly.
4.
Transfer to VAR Control mode.
5.
Adjust the VARs to 30% of the rated VA value.
6.
To determine performance during the following step, monitor the exciter
field current and metered VARs.
7.
Perform a 5% step of the VAR setpoint and observe the response of the
automatic VAR control.
8.
Adjust gains as required to achieve the desired result, and run the test
again.
Содержание 1407-CGCM-DLR
Страница 1: ...Combination Generator Control Module Catalog Numbers 1407 CGCM DLR User Manual OriginalInstructions...
Страница 14: ...14 Rockwell Automation Publication 1407 UM002B EN P February 2019 Chapter 1 General Information Notes...
Страница 204: ...204 Rockwell Automation Publication 1407 UM002B EN P February 2019 Appendix B CGCM DLR Unit Math Models Notes...
Страница 220: ...220 Rockwell Automation Publication 1407 UM002B EN P February 2019 Appendix D Specifications Notes...
Страница 260: ...260 Rockwell Automation Publication 1407 UM002B EN P February 2019 Appendix G Installing the Add on Profile Notes...
Страница 266: ...266 Rockwell Automation Publication 1407 UM002B EN P February 2019 Index Notes...
Страница 267: ......