
120
Rockwell Automation Publication 1407-UM002B-EN-P - February 2019
Chapter 5
CGCM-DLR Unit Startup
Recommended Equipment
You need the following equipment to help in the startup of the CGCM-DLR
unit.
Programming Terminal
A suitable programming terminal (typically a notebook personal computer) with
RSLinx® software, and the Studio 5000 Logix Designer® application is required.
The programming terminal must be equipped with a suitable interface to support
communication with the Logix controller. A typical communication interface
can be a 3-port EtherNet/IP tap (catalog number 1783-ETAP) and patch cables.
Two-channel Chart Recorder or Other Suitable Data-recording
Method
A two-channel recorder or other suitable method is recommended for the
verification procedure. Chart recorder connections vary depending on the test
being performed.
ATTENTION:
Electrostatic discharge can damage integrated circuits or
semiconductors. Follow these guidelines when you handle the module.
Touch a grounded object to discharge static potential.
•
Wear an approved wrist strap-grounding device.
•
Do not open the module or attempt to service internal components.
•
If available, use a static-safe workstation.
•
When not in use, keep the module in its static shield bag.
Содержание 1407-CGCM-DLR
Страница 1: ...Combination Generator Control Module Catalog Numbers 1407 CGCM DLR User Manual OriginalInstructions...
Страница 14: ...14 Rockwell Automation Publication 1407 UM002B EN P February 2019 Chapter 1 General Information Notes...
Страница 204: ...204 Rockwell Automation Publication 1407 UM002B EN P February 2019 Appendix B CGCM DLR Unit Math Models Notes...
Страница 220: ...220 Rockwell Automation Publication 1407 UM002B EN P February 2019 Appendix D Specifications Notes...
Страница 260: ...260 Rockwell Automation Publication 1407 UM002B EN P February 2019 Appendix G Installing the Add on Profile Notes...
Страница 266: ...266 Rockwell Automation Publication 1407 UM002B EN P February 2019 Index Notes...
Страница 267: ......