10.3
Maintenance plan
Maintenance ball swivel connection
Item
6.2
Check the screw connection of the ball swivel connection
after
100 operation hours
and then
every 600 operation hours.
Torque
300 Nm.
Item 8.6
The grease filling will avoid wear and seal and will protect
against corrosion. Therefore grease the bearing
every 50 operation
hours
with a lot of grease, until the grease overflows. During greasing turn
the ball connection of the bucket arm in steps of 20°. Grease all four
greasing points in any position. Before and after a longer period of non-
operation greasing is absolutely necessary.
DANGER
- Before lubrication, the bucket arm support must be placed into position
(1-1/arrow) and the parking brake must be applied.
- Stay clear of the bucket arm swivel area
during
process of swivelling.
S06C
S06C
Maintenance rear axle
pendulum bolt
Item
8.1
The rear axle pendulum
bolt has to be greased
every 50
operation hours
. The greasing
point for this bolt is situated under
the motor cover on the left side of
the machine (10-1/arrow).
Fig. 10-1
10.3
Maintenance plan
Maintenance ball swivel connection
Item
6.2
Check the screw connection of the ball swivel connection
after
100 operation hours
and then
every 600 operation hours.
Torque
300 Nm.
Item 8.6
The grease filling will avoid wear and seal and will protect
against corrosion. Therefore grease the bearing
every 50 operation
hours
with a lot of grease, until the grease overflows. During greasing turn
the ball connection of the bucket arm in steps of 20°. Grease all four
greasing points in any position. Before and after a longer period of non-
operation greasing is absolutely necessary.
DANGER
- Before lubrication, the bucket arm support must be placed into position
(1-1/arrow) and the parking brake must be applied.
- Stay clear of the bucket arm swivel area
during
process of swivelling.
Maintenance rear axle
pendulum bolt
Item
8.1
The rear axle pendulum
bolt has to be greased
every 50
operation hours
. The greasing
point for this bolt is situated under
the motor cover on the left side of
the machine (10-1/arrow).
Fig. 10-1
Содержание AS5
Страница 61: ...S06C S06C Beschilderung Signs Symboler Beschilderung Signs Symboler ...
Страница 78: ...S06C S06C Technische Daten Technical data Tekniska data Technische Daten Technical data Tekniska data ...
Страница 97: ...S06C 3 10 C B A A D E 3 3 3 Frontbagger Front mounted backhoe Grävlastarskopa ...
Страница 99: ...S06C A A C B 3 3 4 Lasthaken Lifting hook Laskrokar 3 11 ...
Страница 101: ...S06C 3 12 3 3 5 Greifer Grab Gripskopa B A B A C C ...
Страница 107: ...S06C 3 15 A D E C B A 3 4 3 Frontbagger Front mounted backhoe Grävlastarskopa ...
Страница 109: ...S06C 3 16 A A C B 3 4 4 Lasthaken Lifting hook Laskrokar ...
Страница 111: ...S06C 3 17 3 4 5 Greifer Grab Gripskopa B A B A C C ...
Страница 113: ...S06C S06C Beschreibung Description Beskrivning Beschreibung Description Beskrivning ...
Страница 136: ...S06C S06C Bedienung Operation Användning Bedienung Operation Användning ...
Страница 157: ...S06C S06C Anbaugeräte Attachments Redskap Anbaugeräte Attachments Redskap ...
Страница 183: ...S06C S06C Wartung Maintenance Underhåll Wartung Maintenance Underhåll ...
Страница 217: ...Anhang Annexes Bilagor Anhang Annexes Bilagor ...
Страница 218: ......
Страница 219: ......
Страница 226: ......
Страница 230: ......
Страница 231: ......
Страница 232: ......