12
Step 5. Assemble the glass breeze break.
Assemble the BA-6TE / BA-6DTE
glass breeze break in the weighing
chamber.
Align the side panes with the notch
of the base stand.
Example of the small breeze break
with the right side open.
Step 6. Insert the breeze break top door
from the handle side.
Step 7. Assemble the breeze break
doors on the left and right sides.
7a Insert the breeze break doors on
the left and right sides.
7b Secure the breeze break doors
with the latches.
Step 8. Assemble the breeze break front
glass.
8a Insert the breeze break front
glass.
8b Secure the breeze break front
glass with the latches.
Top pane
Side panes (3 pieces)
Step 5
.
Base stand
Side pane
Notch
Base stand
Step 7a
.
Step 6
.
Step 8b
.
Step 7b
.
Step 7a
.
Step 8a
Step 8b
.
Step 7b
.
Содержание BA-T Series
Страница 1: ...BA 6TE BA 6DTE BA 225TE BA 225DTE BA 125DTE 1WMPD4004315C...
Страница 5: ...5 11 Calibration test check 101 12 Filter Settings 135 13 System settings 137...
Страница 107: ...107 Output example for daily check output results Daily check output results Daily check PDF results...
Страница 117: ...117 Output example for periodic check output results Periodic check output results...
Страница 118: ...118 Periodic check results PDF...
Страница 129: ...129 AND MEET analysis graph example...
Страница 215: ...215 Unit mm Display unit 138 182 73 Ionizer 162 68 129...
Страница 219: ......