13
Step 9. Using the included cable A and cable B, connect the "weighing unit" and "breeze break unit" (with
the cable A) and the "display unit" and "weighing unit" (with the cable B) respectively, paying
attention to the direction of the arrow on each cable (on the connector).
Caution:
Make sure to unplug the AC adapter before connecting.
Step 10. If the display unit is placed in front of the weighing unit, cable B can be stowed in the left or right
groove of the weighing unit. Loosen the leveling foot when stowing the cable in the groove.
Caution: When stowing the cable, do not tilt the weighing unit.
Step 11. Connect the breeze break unit and ionizer with the included cable C.
Caution: The ionizer operates when the AC adapter is connected to the balance.
Step 12. Connect the included AC adapter to the balance.
Step 10
.
Groove for cable
Loosen the leveling foot when
stowing the cable in the groove
Leveling foot
Groove for cable
Bottom of the weighing unit
Display unit
Breeze break unit
Ionizer
Step 9
Step 12
Cable A
Cable B
AC adapter
Weighing unit
Grounding terminal
Serial number
Step 11
Cable C
Содержание BA-T Series
Страница 1: ...BA 6TE BA 6DTE BA 225TE BA 225DTE BA 125DTE 1WMPD4004315C...
Страница 5: ...5 11 Calibration test check 101 12 Filter Settings 135 13 System settings 137...
Страница 107: ...107 Output example for daily check output results Daily check output results Daily check PDF results...
Страница 117: ...117 Output example for periodic check output results Periodic check output results...
Страница 118: ...118 Periodic check results PDF...
Страница 129: ...129 AND MEET analysis graph example...
Страница 215: ...215 Unit mm Display unit 138 182 73 Ionizer 162 68 129...
Страница 219: ......