Chapter 2: Installation
ZP2-A Series Installation Manual
41
Connecting expansion boards
Caution:
Always disconnect the control panel from the mains power supply
before installing an expansion board.
See your expansion board installation sheet for detailed installation information.
Connecting a fire network
Note:
See your network board installation sheet for detailed installation and
connection information.
Each network board has two ports. Each port is connected (point to point) to the
corresponding ports of the network board in another control panel.
Figure 19: Network board connections
Two wiring options are possible:
• Ring configuration
• Bus configuration
Summary of Contents for ZP2-AF2-P
Page 1: ...ZP2 A Series Installation Manual P N 00 3281 501 2003 01 ISS 22NOV22...
Page 50: ...Chapter 2 Installation 44 ZP2 A Series Installation Manual...
Page 140: ...Chapter 3 Configuration and commissioning 134 ZP2 A Series Installation Manual...
Page 168: ...Appendix C Menu maps 162 ZP2 A Series Installation Manual...
Page 172: ...Appendix D Regulatory information 166 ZP2 A Series Installation Manual...
Page 176: ......