Chapter 3: Configuration and commissioning
116
ZP2-A Series Installation Manual
To configure delayed output group activation:
1. Select Field setup from the Main menu, and then select Output groups.
2. Select Confirmations, and then select the output group to configure.
A list of the available output groups that allow alarm confirmation
configuration is displayed.
3. Select Active, and then select YES (alarm confirmation is required) or NO
(alarm confirmation is not required).
4. Select Alarm1, and then select the confirmation required (DEV, ZONE,
PANEL, or ALWAYS). Repeat this step for Alarm2.
If alarm confirmation is required then the output group is activated only when
both configured alarm confirmation states are detected during the
confirmation delay period.
Extinguishing output group confirmation requires two zones to be configured
for Alarm1 and Alarm2. See note below.
5. Select Delay, and then enter the confirmation delay in seconds (0 to 999).
6. Select EXTnode, and then enter the address of the extinguishing control
panel.
This field is only available when configuring confirmation for an extinguishing
output group.
7. Press F4 (Enter), and then press F1 (Back).
8. Press F1 (Save), F3 (Apply), F4 (Discard), or F2 (Exit).
Remember to apply saved settings from the Main menu.
Note
A remote extinguishing panel can be configured to receive extinguishing
preactivate and activate commands associated with the local extinguishing
output group confirmation.
When one of the two configured confirmation zones (Alarm1, Alarm2) enters into
alarm, the preactivate command is sent to the extinguishing panel (EXTnode).
When the second zone enters into alarm, the activate command is sent to the
extinguishing panel.
Summary of Contents for ZP2-AF2-P
Page 1: ...ZP2 A Series Installation Manual P N 00 3281 501 2003 01 ISS 22NOV22...
Page 50: ...Chapter 2 Installation 44 ZP2 A Series Installation Manual...
Page 140: ...Chapter 3 Configuration and commissioning 134 ZP2 A Series Installation Manual...
Page 168: ...Appendix C Menu maps 162 ZP2 A Series Installation Manual...
Page 172: ...Appendix D Regulatory information 166 ZP2 A Series Installation Manual...
Page 176: ......