
Variable Geometry Diffuser (VGD) calibration screen
Figure 16: Variable Geometry Diffuser 1 calibration screen
This screen allows calibration of the compressor Variable Geometry Diffuser position
potentiometer.
Note:
Requires a login access level of SERVICE.
Table 33: Display only fields
Field/LED name
Description
VGD opening (LED)
Lights when an open signal is being applied to the VGD.
VGD closing (LED)
Lights when a close signal is being applied to the VGD.
VGD feedback voltage
Displays the VGD position potentiometer feedback voltage.
Calibration in progress (LED)
Lights when a calibration sequence is in progress.
Calibration messages
Displays text messages which step the user through the calibration process and
indicate its success or failure.
Table 34: Programmable
Button
Access level
Description
Start calibration Service
Initiates the calibration start.
Cancel calibration Service
Displayed during the VGD calibration process. The user can cancel a calibration
sequence that is in progress.
Table 35: Navigation
Button
Access level
Description
Home
Service
Returns to the Home screen.
VGD 1
Service
Displays the VGD 1 subscreen that allows viewing of the associated VGD parameters.
VGD 2
Service
Displays the VGD 2 subscreen that allows viewing of the associated VGD parameters.
Model YD Mod D with OptiView Control Center
52
Summary of Contents for YD Mod D
Page 2: ...2 Model YD Mod D with OptiView Control Center...
Page 8: ...Nomenclature Model YD Mod D with OptiView Control Center 8...
Page 17: ...Figure 2 Chiller operation flow chart 17 Model YD Mod D with OptiView Control Center...
Page 18: ...Figure 2 Chiller operation flow chart Model YD Mod D with OptiView Control Center 18...
Page 19: ...Figure 2 Chiller operation flow chart 19 Model YD Mod D with OptiView Control Center...
Page 20: ...Figure 2 Chiller operation flow chart Model YD Mod D with OptiView Control Center 20...
Page 21: ...Figure 2 Chiller operation flow chart 21 Model YD Mod D with OptiView Control Center...
Page 22: ...Figure 2 Chiller operation flow chart Model YD Mod D with OptiView Control Center 22...
Page 150: ...Figure 57 Sample printout status Model YD Mod D with OptiView Control Center 150...
Page 151: ...Figure 57 Sample printout status 151 Model YD Mod D with OptiView Control Center...
Page 152: ...Figure 58 Sample printout setpoints Model YD Mod D with OptiView Control Center 152...
Page 153: ...Figure 58 Sample printout setpoints 153 Model YD Mod D with OptiView Control Center...
Page 154: ...Figure 59 Sample printout schedule Model YD Mod D with OptiView Control Center 154...
Page 155: ...Figure 60 Sample printout sales order 155 Model YD Mod D with OptiView Control Center...
Page 156: ...Figure 61 Sample printout history Model YD Mod D with OptiView Control Center 156...
Page 157: ...Figure 61 Sample printout history 157 Model YD Mod D with OptiView Control Center...
Page 159: ...Figure 64 Sample printout custom screen report 159 Model YD Mod D with OptiView Control Center...