
58
YORK INTERNATIONAL
FIG. 17 – 5 STEP LOADING/UNLOADING (RETURN WATER CONTROL)
FIG. 18 – 7 STEP LOADING/UNLOADING (RETURN WATER CONTROL)
LD02665
LD02664
NOTE:
The micro controls loading and unloading
on a 10 STEP scale regardless of the num-
ber of stages present. Therefore, loading
and unloading responses on 5 Step (stan-
dard) chillers may appear delayed (time
between stages increased) when miss-
ing steps are activated or deactivated by
the micro.
NOTES:
1. The “Lead Comp + 2 Steps, Lag Comp
Off” Step is skipped on a temperature
drop.
2. The micro controls loading and unload-
ing on a 10 STEP scale regardless of
the number of stages present. There-
fore, loading and unloading responses
on 7 Step (optional) chillers may ap-
pear delayed (time between stages in-
creased) when missing steps are acti-
vated or deactivated by the micro.
7 STEP (OPTIONAL)
5 STEP (STANDARD)
NOTE: Temperatures in pa-
rentheses are Celsius
equivalents.
Summary of Contents for Millennium YCAJ150
Page 21: ...FORM 150 65 NM4 21 YORK INTERNATIONAL LD02461 FIG 6 ELEMENTARY DIAGRAM Cont d...
Page 22: ...22 YORK INTERNATIONAL ELEMENTARY DIAGRAM...
Page 24: ...24 YORK INTERNATIONAL CONNECTION DIAGRAM FIG 7 CONNECTION DIAGRAM LD02463...
Page 25: ...FORM 150 65 NM4 25 YORK INTERNATIONAL FIG 7 CONNECTION DIAGRAM Cont d LD02462...
Page 30: ...30 YORK INTERNATIONAL FIG 8 SYSTEM WIRING Cont d LD02499...
Page 100: ...100 YORK INTERNATIONAL LD02654 FIG 37B LOUVER BRACKETS INSTALLATION...
Page 103: ...FORM 150 65 NM4 103 YORK INTERNATIONAL LD02656 FIG 39A LOUVER INSTALLATION SIDES...
Page 104: ...104 YORK INTERNATIONAL LD02654 FIG 39B LOUVER BRACKETS INSTALLATION...
Page 108: ...108 YORK INTERNATIONAL FIG 40B CONDENSER COIL LOUVER INSTALLATION FRONT AND BACK LD02659...
Page 110: ...110 YORK INTERNATIONAL FIG 41 REMOTE RESET BOARD LD02666 P1...