
2
YORK INTERNATIONAL
TABLE OF CONTENTS
General Information ..........................................................................................
2
Typical Nomenclature .......................................................................................
3
Unit Components .............................................................................................
4
Compressor Components .................................................................................
5
Operational Limitations .....................................................................................
6
Physical Data ..................................................................................................
8
Dimensions ......................................................................................................
10
Electrical Data .................................................................................................
12
Installation ........................................................................................................
16
Weight Distribution and Isolator Locations ........................................................
18
Wiring Diagrams ..............................................................................................
20
Unit Controls and Operation .............................................................................
31
Display Keys ....................................................................................................
34
Status Key .......................................................................................................
39
Entry Key .........................................................................................................
42
Program Key ....................................................................................................
43
Clock Keys ......................................................................................................
47
Selection of Return or Leaving Chilled Liquid ....................................................
50
Setpoints Keys ................................................................................................
51
System Safeties ..............................................................................................
61
Print Keys ........................................................................................................
67
Unit On / Off Switch .........................................................................................
74
Compressor Capacity Control ...........................................................................
80
System Startup Checklist ................................................................................
81
Preventative Maintenance .................................................................................
86
Options ............................................................................................................
88
Troubleshooting Chart ...................................................................................... 106
Temperature Conversion Tables ........................................................................ 110
GENERAL INFORMATION
GENERAL DESCRIPTION
These packaged liquid chillers are completely self-
contained outdoor units shipped ready for final job instal-
lation requiring only liquid connections, power and con-
trol wiring. They are designed primarily for central sta-
tion air conditioning applications with normal installa-
tions being on roof-tops or on ground level beside the
building.
CODE STATUS
The units are designed in accordance with UL (200, 230,
460-3-60), N.E.C., ASHRAE/ANSI STANDARD 15, and
ASME Codes.
Summary of Contents for Millennium YCAJ150
Page 21: ...FORM 150 65 NM4 21 YORK INTERNATIONAL LD02461 FIG 6 ELEMENTARY DIAGRAM Cont d...
Page 22: ...22 YORK INTERNATIONAL ELEMENTARY DIAGRAM...
Page 24: ...24 YORK INTERNATIONAL CONNECTION DIAGRAM FIG 7 CONNECTION DIAGRAM LD02463...
Page 25: ...FORM 150 65 NM4 25 YORK INTERNATIONAL FIG 7 CONNECTION DIAGRAM Cont d LD02462...
Page 30: ...30 YORK INTERNATIONAL FIG 8 SYSTEM WIRING Cont d LD02499...
Page 100: ...100 YORK INTERNATIONAL LD02654 FIG 37B LOUVER BRACKETS INSTALLATION...
Page 103: ...FORM 150 65 NM4 103 YORK INTERNATIONAL LD02656 FIG 39A LOUVER INSTALLATION SIDES...
Page 104: ...104 YORK INTERNATIONAL LD02654 FIG 39B LOUVER BRACKETS INSTALLATION...
Page 108: ...108 YORK INTERNATIONAL FIG 40B CONDENSER COIL LOUVER INSTALLATION FRONT AND BACK LD02659...
Page 110: ...110 YORK INTERNATIONAL FIG 41 REMOTE RESET BOARD LD02666 P1...