FORM 150.65-NM4
11
YORK INTERNATIONAL
WEIGHT DISTRIBUTION (Kg)
WATER
CONN.
MODEL YCA
INLET/OUTLET
A
B
C
D
E
F
G
H
DIA. (INCHES)
J150
812
822
836
966
788
849
859
912
8
J160
854
869
885
1011
818
884
896
948
8
J180
880
900
907
1027
898
989
997
1021
8
J190
880
900
908
1031
898
989
997
1025
8
J200
919
943
949
1073
964
1071
1078
1097
8
J220
919
943
949
1073
964
1071
1078
1097
8
J230
950
974
981
1107
978
1085
1104
1116
8
CHILLER
X
J150
432 mm
J160
432 mm
J180
457 mm
J190
457 mm
J200
470 mm
J220
470 mm
J230
470 mm
DIMENSIONS
(SI)
LD01196
LD01197
LD01198
LD01199
NOTES:
1. Clearances – Recommended YORK clearances for peak per-
formance, reliable operation, and maintenance:
Side to wall – 2440 mm; Rear to wall – 2440 mm; Control panel
end to wall – 1525 mm; Over the top – no obstructions al-
lowed; Two units side by side – 3660 mm, (walls should be no
higher than the unit). The area within the clearances and under
the unit(s) must be kept clean of clutter. Additional height should
be included to allow for snow accumulation for units which are
expected to operate at full load during the winter. Reduced clear-
ances may be used due to jobsite restrictions. The unit(s) with
optional controls will allow optimal operation preventing the con-
denser pressure from exceeding the maximum limit. The units
will continue to operate without nuisance high pressure cutout
even though the airflow may be restricted at these conditions.
2. Cooler liquid connection sizes (inlet & outlet) 203 mm victaulic for
all models.
3. Drawings not to scale and are for planning purposes only. Con-
tact nearest YORK Sales Office for detailed drawings.
4. Spring isolator (optional) will increase height of unit by approxi-
mately 152 mm.
5. Modules have 29 mm space between to facilitate maintenance.
CAUTION
FAILURE TO HEED ABOVE RECOMMENDED CLEARANCES MAY RESULT IN
REDUCED SYSTEM PERFORMANCE, NUISANCE SHUTDOWNS, AND SERVICE PROBLEMS.
Summary of Contents for Millennium YCAJ150
Page 21: ...FORM 150 65 NM4 21 YORK INTERNATIONAL LD02461 FIG 6 ELEMENTARY DIAGRAM Cont d...
Page 22: ...22 YORK INTERNATIONAL ELEMENTARY DIAGRAM...
Page 24: ...24 YORK INTERNATIONAL CONNECTION DIAGRAM FIG 7 CONNECTION DIAGRAM LD02463...
Page 25: ...FORM 150 65 NM4 25 YORK INTERNATIONAL FIG 7 CONNECTION DIAGRAM Cont d LD02462...
Page 30: ...30 YORK INTERNATIONAL FIG 8 SYSTEM WIRING Cont d LD02499...
Page 100: ...100 YORK INTERNATIONAL LD02654 FIG 37B LOUVER BRACKETS INSTALLATION...
Page 103: ...FORM 150 65 NM4 103 YORK INTERNATIONAL LD02656 FIG 39A LOUVER INSTALLATION SIDES...
Page 104: ...104 YORK INTERNATIONAL LD02654 FIG 39B LOUVER BRACKETS INSTALLATION...
Page 108: ...108 YORK INTERNATIONAL FIG 40B CONDENSER COIL LOUVER INSTALLATION FRONT AND BACK LD02659...
Page 110: ...110 YORK INTERNATIONAL FIG 41 REMOTE RESET BOARD LD02666 P1...