![Yamaha 40 Installation Manual Download Page 76](http://html1.mh-extra.com/html/yamaha/40/40_installation-manual_3214052076.webp)
67
E
8. Check:
• Throttle operation
Unsmooth operation
→
Adjust.
9. Connect:
• Warning indicator lead coupler
1
• Wiring harness coupler
2
NOTE:
Fasten the wiring harness coupler at the plas-
tic tie.
Checking steps:
• Turn the shift lever to the neutral position.
• Fully open and close the throttle several
times.
• Check that the throttle valve fully opens
and closes.
1
10. Install:
• Fitting plate
1
• Bolts
2
NOTE:
After secure the fitting plate, lift the tiller handle
straight up and check that the cables and wires
are not stretched.
T
R
.
.
Bolt:
8.0 N • m (0.82 kgf • m, 5.9 ft • lb)
(For F50A, FT50B, FT50C, and
F50D)
10.0 N • m
(1.02 kgf • m, 7.4 ft • lb)
(For F40C, F60A, and FT60B)
TillerHandle.book Page 67 Friday, April 12, 2013 3:19 PM