
63
E
2. Install:
• Grommet
1
• Wiring harness
2
• Battery cable
3
• Warning indicator lead
4
NOTE:
Align the taped end
a
of the battery cable with
the end of the grommet.
3. Install:
• Cable stopper
1
• Rubber seal
2
• Shift cable
3
• Throttle cable
4
4. Adjust:
• Shift cable joint position
Adjustment steps:
• Set the shift lever
1
to the neutral posi-
tion.
• Align the center of the set pin
2
with the
mark
a
on the bracket.
• Adjust the position of the cable joint
3
until its hole aligns with the set pin.
• Install the clip
4
and tighten the locknut
5
.
WARNING
The cable joint must be screwed in a
minimum of 8.0 mm (0.31 in).
TillerHandle.book Page 63 Friday, April 12, 2013 3:19 PM