![Yamaha 40 Installation Manual Download Page 182](http://html1.mh-extra.com/html/yamaha/40/40_installation-manual_3214052182.webp)
173
E
4. Connect:
• Wiring harness coupler
1
• Warning indicator coupler
2
NOTE:
Tighten the plastic tie
a
after connecting the
wiring harness coupler.
5. Connect: (F80B, F100D)
• Variable trolling RPM switch coupler
1
1
1
6. Install:
• Grommet
1
• Fuel hose
2
• Battery cable
3
• Speedometer hose
4
• Wiring harness
5
• Variable trolling RPM switch lead (F80B,
F100D) and warning indicator lead
6
• Shift cable
7
• Throttle cable
8
• Immobilizer wiring harness
9
NOTE:
Align the taped end
a
of the battery cable with
the end of the grommet.
È
F80B, F100D
É
F115A
9
5
8
7
2
1
3
4
6
a
a
É
È
TillerHandle.book Page 173 Friday, April 12, 2013 3:19 PM