177
E
9. Install:
• Corrugated tube
1
65 mm (2.6 in) (F80B, F100D)
85 mm (3.3 in) (F115A)
• Plastic ties
2
• Plastic tie
3
WARNING
Be sure to route and securely install the
fuel hose into the hose guide
a
. Check that
the fuel hose does not interfere with the
steering friction.
NOTE:
• Route the fuel hose, battery cable, wiring
harness, variable trolling RPM switch lead
(F80B, F100D), and warning indicator lead
through the corrugated tube
1
.
• Install the corrugated tube
1
near the grom-
met.
3
2
2
1
a
10. Install:
• Corrugated tube
1
(230 mm (9.1 in))
• Plastic ties
2
NOTE:
Route the wiring harness, throttle cable, shift
cable, variable trolling RPM switch lead (F80B,
F100D), and warning indicator lead through
the corrugated tube
1
.
2
1
2
TillerHandle.book Page 177 Friday, April 12, 2013 3:19 PM