Maintenance
Pges
3 - 22
ba43121e03
01/2011
5
Select the
Replace the pump tubings
service with
68
and confirm with
3
. The 1st part of the checklist appears on
the display.
6
Pull the sample tubing out of the overflow vessel.
7
Disconnect the canisters with consumables from the tubes.
8
Place two suitable collecting containers (recommended
capacity of 0.5l) on the tray of reagents so that all the ends of
the tubes can be stuck into the collecting containers. If
necessary, raise the collecting containers by using suitable
tools (e.g. hydraulic lifts, blocks).
9
Stick all the ends of the tubes into the collecting containers.
10
Confirm the prompts each time with
3
after checking. After
the last confirmation, the procedure begins immediately and
the remaining duration appears on the display.