Pges
Maintenance
3 - 7
ba43121e03
01/2011
3.3
Replenish NaOH (cleaning solution)
This routine fills the wet chemical system with cleaning solution
(NaOH). The supply and connection of the cleaning solution to the
analyzer module is described in section 1.3.4 C
ONNECTING
THE
PERMEATE
AND
CONSUMABLES
.
Duration
approx. 2 minutes
Note
You cannot quit the procedure.
Starting the procedure
1
Check whether the container of cleaning solution is sufficiently
full and correctly connected (see section 1.3.4 C
ONNECTING
THE
PERMEATE
AND
CONSUMABLES
).
2
Measuring mode
Select the TresCon Pges module with
68
.
3
Call up the
Parameters Pges
menu with
3
. The main menu
appears on the display.
4
Select the
Service
menu item with
68
and confirm with
3
. The service menu appears.
5
Select the
Replenish NaOH
menu item with
68
and
confirm with
3
. A checklist appears on the display.
6
Confirm the prompts each time with
3
after checking. After
the last confirmation, the procedure begins immediately and
the remaining duration appears on the display.