Overview
Pges
1 - 14
ba43121e03
01/2011
1.3.4
Connecting the permeate and consumables
Note
Most of the reagents and consumables are already prepared ready to
use. The reagent C and cleaning solution have to be freshly prepared
(see section 6.5).
This section is about the connection of the permeate and reagent
supply.
Warning
Only trained personnel is allowed to work on the analyzing section.
Always take safety precautions when handling chemicals and comply
with the relevant regulations. This applies especially to the warning
instructions on the chemical containers and in the safety data sheets.
Always use the proper safety equipment!
Connecting the
permeate supply
Fig. 1-13 Connecting the permeate feed
Wear protective
goggles
Wear protective
gloves
Wear protective
clothing
1
Feed the permeate tube of the TresCon Pges module (black,
ID = 1.5 mm) out through the hole drilled in the base of the
housing to the outside.
2
Stick the permeate tubing into the overflow vessel provided.
To the overflow vessel
Drilled hole
Enclosure base