Pges
Maintenance
3 - 27
ba43121e03
01/2011
11
After expiry of the 1st part of the routine: The 2nd part of the
checklist appears on the display. During the following
activities, the TresCon Pges module remains in the Wait mode.
The steps 12 to 14 have to be carried out for each individual
pump tube.
12
Swing out the pump cassette. To do so, open the gripping
lever. Subsequently, unlock the pump cassette by pressing on
the gripping lever and swing out the pump cassette.
13
Displace the pump tubing. Insert the pump tube in the pump
cassette so that the first (used) section is on the pressure side.
2. Unlock
3. Tilt pump cassette
to the side
1. Open gripping lever
4. Remove pump
cassette
Standard/sample pump tubing:
blue/blue/blue
Reagent pump tubing:
orange/green/orange