
Accumulator, pressure releasing
1 Lower the attachment completely to the ground.
2 Keep all the attachments such as hammer
closed.
3 After turning off the engine, turn the ignition
switch to operating position.
4 Move the control lockout lever down to unlock
the system.
5 To release the pressure in the control circuits
and accumulator, move the operating levers and
pedals forward / rearward and left / right to their
respective end positions.
6 Turn the ignition switch to stop position.
7 Move the control lockout lever up to lock the
system securely.
294
Maintenance
Maintenance service, when required
Summary of Contents for EC60E
Page 1: ...VOLVO CONSTRUCTION EQUIPMENT ec60E operator s manual ...
Page 5: ......
Page 9: ......
Page 341: ...340 Alphabetical index ...