8
Multi-Lane
4/2022 (EN)
Connection using a connection set
Connection across several levels
3.3 Ceiling mounting
3.3.1 Installation of connectors with ceiling
attachment
NOTE
The suspended mounting takes place using M10
threaded rods (DIN 976-1 8.8, not supplied).
The correct size and type of anchor fixings must be
used to suit the construction conditions.
>
Check anchor fixing as specified by manufac-
turer.
Definition of the suspension points and load
For preparation, the required number of plates for the
connectors must be bolted to the ceiling.
Fig. 6: Bolt the plate to the ceiling
WARNING
>
The suspension point (attachment means) must
be able to bear at least 9.2 kN (design value).
>
Load from merchandise supports and merchan-
dise 150 kg/m or 80 kg per hanger adapter.
>
Each Multi-Lane profile is joined to one another
via a connector.
>
The Multi-Lane profile length is a maximum of
3000 mm
>
Each Multi-Lane profile is attached to the ceiling
using at least two suspension elements.
Mounting connectors
25 Nm
Fig. 7: Assemblying connectors
Alignment
10˚
10˚
Fig. 8: Aligning connectors
The connector can be installed at up to a 10° angle.