5
Multi-Lane
4/2022 (EN)
General
Specification
Value Unit
Operating voltage
120–240 V AC
Frequency
50–60 Hz
Nominal voltage (SELV)
24 V
Maximum load
60 W
Mains protection class
II
2.3 Weight loading
The maximum load applies including the dead weight
and the weight of all components.
WARNING
Do not place any merchandise (e.g., televisions,
vases, etc.) onto the shelves, which can cause inju-
ries when falling down.
Merchandise support frame
Specification
Load
Maximum load
160 kg
Merchandise support frame including floor mounting
Specification
Load
Maximum load
120 kg
Uprights
Specification
Load
Maximum load
120 kg
Frame
Specification
Load
Maximum load
120 kg
M8 universal adapter
Specification
Load
Maximum load
30 kg
Shelves
Specification
Load
Maximum load
40 kg
Hanging rail
Specification
Load
Maximum load
40 kg
Hanging rail with front arm
Specification
Load
Maximum load
40 kg
2.4 Unpacking
Check the delivery for completeness and transport dam-
age immediately upon receipt.
Proceed as follows if there is apparent transport damage:
• Do not accept delivery, or only accept delivery subject
to reservation.
• Note the scope of damage on the transport docu-
ments or on the delivery ticket of the freight forwarder.
• Initiate the claim process.
Packaging
The product is safely packed so that transport damage is
unlikely.
• Keep the original packaging for later transport.
• Only ship the product in the original packaging.
• Comply with all instructions that are specified on the
packaging.
Disposing of packaging material
If packaging material is no longer required, dispose of
it in accordance with the locally-applicable disposal
regulations.
3 Ceiling system installation
3.1 Requirements for the installation
location
The installation location must meet the following require-
ments:
• The installation location must be dry. Installation out-
doors is prohibited.
• The ceiling must be designed for, and able to support,
the load to be borne (check with architect and struc-
tural engineer).
• Take account of items already fixed to the ceiling (ven-
tilation, sprinklers, services supply lines, etc.).
Determining the surface loading for the load carry-
ing ceiling
Multi-Lane profile
=
x
C
Surface loading
for the ceiling
A
: Total length Multi-Lane profile [m]
B
: load-bearing capacity 150 + 25
=
175 kg/m
C
: Degree of loading
A
x
B
Converted surface
Converted surface
Fig. 3: Determining the surface loading for the load carrying ceiling