30
Multi-Lane
4/2022 (EN)
5. Moving the frame
for smoothly moving the frame, it is recommended to
grab the vertical tube at its top half.
Fig. 76: Moving frames
7.2 Removing frame on castors with guide
adapter
WARNING
Risk of injury from goods or frames falling down.
The system can fail if the maximum permissible
load of the frames is exceeded.
1. Slightly loosened the screws on the bottom of the
guide and push the brackets to the side.
2. Lower the guide and carefully set the frame to the
side with two people.
Fig. 77: Guide disassembly
7.3 Attaching frame to castors with 230 V
cable conduit.
A channel with a built-in cable conduit can be mounted
into the Multi-Lane track for the power supply of a slding
frame.
The consumer can be connected to a GST 18 socket (1)
within the frame.
Connection of the supply cable takes place using a multi-
adapter (2) for 3-phase power tracks (Nordic Aluminium
GA69).
3200
1
2
Fig. 78: Connection options
Installation of the cable channel with a cable
conduit
1. Insert the channel from below into the grove of the
Multi-Lane rail. Locking occurs via laterally protruding
tabs. These must be bent out 2 mm prior to installing
the channel
In this area of the cable conduit, no power track must be
installed in the Multi-Lane rail.
Fig. 79: Clipping the cable conduit into the Multi-Lane rail