27
Multi-Lane
4/2022 (EN)
2. Guide the panels with the threaded pins at an angle
into the designated bore holes.
3.
Fold in the panels and unscrew the two threaded pins
using an Allen key (SW1.5) by approx. 10 mm.
Â
Thereby, the panels are secured.
SW1,5
Assembly of shelf on the suspended tube
*
*Plug-in shelf brackets (702758)
6 Operation of panels with slid-
ing adapter
6.1 Attaching Grid 50 panel with sliding
adapter
WARNING
Risk of injury from goods or merchandise supports
falling down. The system can fail if the maximum
permissible load of the merchandise support is ex-
ceeded.
>
Observe the maximum load values of the indi-
vidual merchandise supports.
>
Do not exceed the maximum load of 160 kg per
frame.
>
The merchandise supports must only be moved in
the unloaded state.
WARNING
Risk of injury from falling merchandise supports.
During assembly, the merchandise support could
fall down at any time.
>
The merchandise support must be firmly held
during assembly.
1. Loosen screws on one side using an SW4/SW5 Allen
key and set the intermediate dimension to 55 mm.
55
Fig. 65: Preparing the hanger adapter
2. With 2 people, align panel and set up vertically under
the Multi-Lane rail.
3. Attach adapter as is described under „4.9 Attaching
the suspended merchandise support frame with the
sliding adapter“.
Fig. 66: Setting up panel