26
Multi-Lane
4/2022 (EN)
5.3 Uprights with partition system
Connecting tube set assembly
Mounting the uprights with a connecting tube set for
panels (2x D6 bore holes).
Drill holes must point upwardly/downwardly.
45°
45°
Fig. 64: Install connecting tube set
Suspended point panel assembly
1. Suspend the two hanging rail supports laterally into
the uprights.
2. Set the hanging rail from top to bottom over the
hanging rail supports.
3. Affix using the two countersunk screws.
SW3
Assembly of panels
1. Unscrew the bottom two threaded pins with the aid of
an Allen key (SW2.5) by about 10 mm.
SW2,5