29
Multi-Lane
4/2022 (EN)
7 Operation of frame on castors
7.1 Attaching frame on castors with guide
adapter
The frames are disassembled when delivered. The side
parts are pre-assembled.
1. Mounting the connecting tubes to the side parts.
1.
2.
Fig. 72: Connecting the side parts to the tubes
NOTE
The connecting tubes must be rotated with the as-
sembly tool 111-844.12 and positioned properly.
WARNING
Risk of injury from goods or frames falling down.
The system can fail if the maximum permissible load
of the frames is exceeded.
>
Please note the maximum load value of the indi-
vidual frames.
>
Do not exceed the maximum load of 120 kg per
frame.
>
The fames must only be moved in the unloaded
state.
2. Slightly loosened the screws on the bottom of the
guide and push the bracket to the side.
Fig. 73: Loosen screws
3. Said the guide upwards over the Multi-Lane rail and
allow both sliding elements to lock into the lateral
grooves. Push the brackets together and firmly tighten
all screws (2x) with 10 Nm using the Allen key.
F
=
10 Nm
Fig. 74: Mount the guide on the rail
4. Align frame vertically.
It must be ensured that the frame is standing vertically
under the rail. Only then is smooth shifting possible.
90
°
Fig. 75: Aligning frame.