43
Electrical installation scheme
230 V/ 50 Hz
212.3
X2.N
X1.
ZP
3
F6
STS
4
PT500
F7
STS
5
PT500
Low voltage
224.7
X2.N
2
211.4
X2.N
X1.
UPSB
6
50 W
130 W
L1 L1 L1
N N N
M
1~
M
1~
Required parameter settings
Set the required parameters during commissioning; see from page 110.
Parameter
Setting
"System definition"
■
"System scheme 7000"
"0"
/
"2"
/
"4"
/
"6"
/
"8"
/
"10"
DHW heating:
"Time program DHW"
Set time program (see oper-
ating instructions)
"Time prog. DHW circ."
(if a DHW circulation pump is installed)
Set time program (see oper-
ating instructions)
"DHW"
■
"Temperature sensor at bottom of DHW cylinder
600E"
"0"
/
"1"
■
"Enable booster heaters for DHW heating 6014" "1"
■
"Enable electric heaters for DHW heating 6015"
"1"
Preparing for installation
DHW heating
(cont.)
5692 875 GB
Installation
Summary of Contents for Vitocal 300 AWO-M-AC 301.A
Page 5: ...5 Certificates Declaration of conformity 148 Keyword index 149 Index Index cont 5692 875 GB...
Page 47: ...47 Installation sequence Removing the transport brackets cont 5692 875 GB Installation...
Page 52: ...52 3x 3x 3x 3x 9 8 Installation sequence Fitting the outer panels cont 5692 875 GB...
Page 53: ...53 3x 10 3x 2x 11 Installation sequence Fitting the outer panels cont 5692 875 GB Installation...
Page 104: ...104 Fitting the front panel 1 2 2 Installation sequence Closing the heat pump cont 5692 875 GB...
Page 128: ...128 051 052 008 066 038 063 064 Parts lists Parts list type AWCI M AC 301 A cont 5692 875 GB...