18
A
Concrete foundations as previously
described and according to local
requirements and in accordance
with the standard rules of building
engineering
B
Frost protection (compacted
crushed stone, e.g. 0 to 32/56 mm),
thickness of layer subject to local
requirements and building rules
C
Hydraulic connection set (heating
water flow and return)
D
Soft ground, gravel or crushed stone
E
Connecting cables (LV and control
cables) and power cable to the con-
trol panel
F
Condensate drain
Note
Before laying the concrete foundations,
trim the hydraulic connection pipes
(heating water flow and return), install
the connection fittings and provide frost
protection.
Preparing for installation
External heat pump type AWO-M-AC 301.A
(cont.)
5692 875 GB
Summary of Contents for Vitocal 300 AWO-M-AC 301.A
Page 5: ...5 Certificates Declaration of conformity 148 Keyword index 149 Index Index cont 5692 875 GB...
Page 47: ...47 Installation sequence Removing the transport brackets cont 5692 875 GB Installation...
Page 52: ...52 3x 3x 3x 3x 9 8 Installation sequence Fitting the outer panels cont 5692 875 GB...
Page 53: ...53 3x 10 3x 2x 11 Installation sequence Fitting the outer panels cont 5692 875 GB Installation...
Page 104: ...104 Fitting the front panel 1 2 2 Installation sequence Closing the heat pump cont 5692 875 GB...
Page 128: ...128 051 052 008 066 038 063 064 Parts lists Parts list type AWCI M AC 301 A cont 5692 875 GB...