61
4.
Route condensate drain
D
out of the
heat pump in such a manner that it
does not contact hot, vibrating or
sharp-edged components.
Connect the condensate hose to the
on-site sewer via a siphon (min.
backup level 60 mm).
Technical guide
!
Please note
The condensate hose can
freeze up.
Thermally insulate the con-
densate hose against frost; if
required, install auxiliary heat-
ing.
5.
Route hydraulic lines
A
and
C
out
of the heat pump and connect with
the lines in the foundations duct.
!
Please note
Water-carrying pipes can
freeze up.
Thermally insulate pipes
inside and outside the heat
pump against frost.
Fitting the flow temperature sensor, secondary circuit
The flow temperature sensor for the sec-
ondary circuit is installed in the heating
water flow
inside the building
.
Note
If an instantaneous heating water heater
is installed, fit the flow temperature sen-
sor for the secondary circuit in the heat-
ing water flow downstream of the
instantaneous heating water heater.
Installation sequence
Connecting the heating circuits and condensate…
(cont.)
5692 875 GB
Installation
Summary of Contents for Vitocal 300 AWO-M-AC 301.A
Page 5: ...5 Certificates Declaration of conformity 148 Keyword index 149 Index Index cont 5692 875 GB...
Page 47: ...47 Installation sequence Removing the transport brackets cont 5692 875 GB Installation...
Page 52: ...52 3x 3x 3x 3x 9 8 Installation sequence Fitting the outer panels cont 5692 875 GB...
Page 53: ...53 3x 10 3x 2x 11 Installation sequence Fitting the outer panels cont 5692 875 GB Installation...
Page 104: ...104 Fitting the front panel 1 2 2 Installation sequence Closing the heat pump cont 5692 875 GB...
Page 128: ...128 051 052 008 066 038 063 064 Parts lists Parts list type AWCI M AC 301 A cont 5692 875 GB...