68
1. Type AWCI-M-AC 301.A
:
Route the 230 V~ cables through one
cable entry, and the LV lead through
the other cable entry in the l.h. or r.h.
side panel.
Type AWO-M-AC 301.A
:
Cut one entry in the sealing mat for
the 230 V~ cables and a second entry
for the LV lead. Route the cables from
below through the sealing mat.
2.
Route the cables through the pre-fit-
ted retainers. Secure the LV lead and
230 V~ cables separately.
3.
Danger
Cables/leads that are too
short can break off when the
control panel moves.
Secure the cables below the
front edge of the control panel
with a loop to the cable
bracket (see diagrams
above).
4.
Push the connecting leads/cables
(LV lead < 42 V and control cable
230 V~) from the heat pump control
unit onto the distributor PCB in the
control panel (see page 69).
5.
Route 230 V~ power cable through
cable entry and apply strain relief.
Make the power connection as
described on page 97.
Note
The 230 V~ power connection is pro-
tected against accidental contact with
a contact shield. This contact shield
can be sealed for power-OFF (if
required) (see page 99 and
page 100).
Installation sequence
Electrical connections in the control panel
(cont.)
5692 875 GB
Summary of Contents for Vitocal 300 AWO-M-AC 301.A
Page 5: ...5 Certificates Declaration of conformity 148 Keyword index 149 Index Index cont 5692 875 GB...
Page 47: ...47 Installation sequence Removing the transport brackets cont 5692 875 GB Installation...
Page 52: ...52 3x 3x 3x 3x 9 8 Installation sequence Fitting the outer panels cont 5692 875 GB...
Page 53: ...53 3x 10 3x 2x 11 Installation sequence Fitting the outer panels cont 5692 875 GB Installation...
Page 104: ...104 Fitting the front panel 1 2 2 Installation sequence Closing the heat pump cont 5692 875 GB...
Page 128: ...128 051 052 008 066 038 063 064 Parts lists Parts list type AWCI M AC 301 A cont 5692 875 GB...