22
Power cable to control panel
B
Outside the building, run the power cable
to control panel
B
as an earth cable
(NYY), or route a NYM cable inside a KG
conduit.
Observe the regulations imposed by
your local power supply utility.
Cable length required in the heat pump
from top edge of foundation: min.
2.6 m.
Connecting cables
D
Route prepared cables/leads (control
cable 230 V~ and LV lead < 42 V)
D
inside a KG conduit DN 100. Protect the
plugs at the ends of the cables from dirt
and damage (e.g. with bubble wrap).
Routing KG conduits
■ Provide a wire pull for connecting
cables
D
.
■ To facilitate the routing of cables
D
through the KG conduit, avoid 90º
bends; instead use 3 x 30º or 2 x 45º.
■ Route the KG conduit with a fall
towards the heat pump and fit a con-
densate drain if required.
■ Ensure on-site wall duct
I
is mois-
ture-proof and waterproof.
■ Seal the apertures of the KG conduit
so that no animals or moisture can
enter the building.
Preparing for installation
External heat pump type AWO-M-AC 301.A
(cont.)
5692 875 GB
Summary of Contents for Vitocal 300 AWO-M-AC 301.A
Page 5: ...5 Certificates Declaration of conformity 148 Keyword index 149 Index Index cont 5692 875 GB...
Page 47: ...47 Installation sequence Removing the transport brackets cont 5692 875 GB Installation...
Page 52: ...52 3x 3x 3x 3x 9 8 Installation sequence Fitting the outer panels cont 5692 875 GB...
Page 53: ...53 3x 10 3x 2x 11 Installation sequence Fitting the outer panels cont 5692 875 GB Installation...
Page 104: ...104 Fitting the front panel 1 2 2 Installation sequence Closing the heat pump cont 5692 875 GB...
Page 128: ...128 051 052 008 066 038 063 064 Parts lists Parts list type AWCI M AC 301 A cont 5692 875 GB...