VERSUM MATERIALS, INC. APx DISTRIBUTION SYSTEM FIELD START-UP CHECKLIST
page 4 of
8
FUNCTIONAL TEST -
DIGITAL ALARMS
Record label from software documentation. Record, verify and test the digital
alarms and the hardwire shutdowns. Note: Jumper must be removed for
hardwire shutdown to be activated.
Digital In
#
Label
Hardwire SD
loc.
Checked
Main Board Inputs
1
Emergency Stop
---
2
Cabinet Exhaust
---
3
Z-purge
---
4
Instrument Air
---
5
Supervised Input #1 FAULT
---
6
Supervised Input #1 ALARM
---
7
Supervised Input #2 FAULT
---
8
Supervised Input #2 ALARM
---
9
Left Terminal Box Switch 1
---
10
Left Terminal Box Switch 2
---
11
Left Terminal Box Switch 3
---
12
Left Terminal Box Switch 4
---
13
Left Terminal Box Switch 5
---
14
Left Terminal Box Switch 6
---
15
Left Terminal Box Switch 7
---
16
Left Terminal Box Switch 8
---
17
Left Terminal Box Switch 9
---
18
Left Terminal Box Switch 10
---
19
Left Terminal Box Switch 11
---
20
Left Terminal Box Switch 12
J23
21
Right Terminal Box Switch 1
---
22
Right Terminal Box Switch 2
---
23
Right Terminal Box Switch 3
---
24
Right Terminal Box Switch 4
---
25
Right Terminal Box Switch 5
---
26
Right Terminal Box Switch 6
J3
27
Right Terminal Box Switch 7
---
28
Right Terminal Box Switch 8
---
29
Right Terminal Box Switch 9
---
30
Right Terminal Box Switch 10
---
31
Right Terminal Box Switch 11
---
32
Right Terminal Box Switch 12
---
CONTINUED ON NEXT PAGE