MNL000447.doc
Revision 0 0
09/19/2016
© Versum Materials, Inc. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page
-
14
21.
From the Main Menu, select “START PROCESS.”
22.
The controller will open the process gas inlet isolation
valve on the selected Line.
23.
Adjust the Line regulator, through the access window, to
the desired delivery pressure.
24.
Process gas is now flowing to the process equipment.
With process gas flowing
through Line 1, the valves on
the graphic display will
appear as illustrated to the
right.
25.
Note the color coding
key on the graphic:
Color screen:
Red - valve open
Green - valve closed
Isolate downstream process equipment from the valve
manifold box when process gas is not required to prevent
back contamination.