Document No: LT0255
F3200/NDU AS4428.1 Installation Manual
Alignment, Adjustment & Placing into Operation
Issue 1.22
5 July 2016
Page 7-3
7.2
PLACING INTO OPERATION
7.2.1
GENERAL
This chapter describes the procedure to place an F3200 FIP into operation. It assumes that
the mains and other field wiring has been connected, but that the battery has not and the
mains is not yet switched on. Note that all electronic modules were tested and adjusted in
the factory and should need no further adjustment.
Before switching on power (mains), inspect the cabinet and internals. Check as follows:
1.
Check that all equipment is securely mounted, and that all cables are connected at
the appropriate points. The factory checklist is included.
2.
Check that the 8 way modules and (if required) the 16 Zone LED Displays are fitted
and connected correctly. (See Sections 2.3.2, 4.2 and 5.11).
3.
Check that any additional overcurrent protection device is fitted as per Chapter 4.
Note that batteries are not yet connected.
4.
Check that links Lk2-4 on the MAF are fitted (unless Anc3, clean contacts is being
used), and module relay supervision links are fitted in the S position for relays which
require supervision.
5.
Check that the field wiring of AZC and relays is as per the "As Built" wiring diagrams
and corresponds to the configuration of modules and links.
The "MAINS ISOLATE SWITCH" is located at the top right hand side of the cabinet rear, to
the left of the mains transformer, behind the inner display door. This controls the mains
power to the FIP, charger and power supply, and should be left on once the FIP is
operational.
NOTE: The Battery is not disconnected by the "MAINS ISOLATE SWITCH".