(c) Install the oil pan with the fifteen bolts and four nuts.
Torque: 60 kg–cm (52 in.–lb, 5.9 N
⋅
m)
(d) Install the dipstick.
11. INSTALL STIFFENER PLATE
Install the stiffener plate with the two bolts.
Torque: 380 kg–cm (27 ft–lb, 37 N
⋅
m)
12. INSTALL FRONT ENGINE MOUNTING BRACKET AND
INSULATOR (See step 7 on page
)
13. INSTALL ENGINE MOUNTING CENTER MEMBER
(See step 10 on page
)
14. CONNECT FRONT EXHAUST PIPE
(See step 14 on page
)
15. INSTALL SUSPENSION LOWER CROSSMEMBER
(See step 15 on page
)
16. INSTALL ENGINE UNDER COVERS
17. CONNECT CABLE TO NEGATIVE TERMINAL OF
BATTERY
18. FILL WITH ENGINE OIL (See page
19. START ENGINE AND CHECK FOR LEAKS
20. RECHECK ENGINE OIL LEVEL (See page
21. INSTALL
HOOD
–
LUBRICATION SYSTEM
Oil Pump
LU–17
Summary of Contents for 2VZ-FE
Page 1: ...ENGINE MECHANICAL EM 1 ENGINE MECHANICAL Description Operation ...
Page 31: ...CYLINDER HEADS COMPONENTS EM 29 ENGINE MECHANICAL Cylinder Heads ...
Page 63: ...CYLINDER BLOCK REMOVAL OF ENGINE EM 61 ENGINE MECHANICAL Cylinder Block ...
Page 64: ...EM 62 ENGINE MECHANICAL Cylinder Block ...
Page 71: ...COMPONENTS EM 69 ENGINE MECHANICAL Cylinder Block ...
Page 106: ...EFI SYSTEM FI 1 ...
Page 107: ...DESCRIPTION FI 2 EFI SYSTEM Description ...
Page 111: ...OPERATION System Circuit FI 4 EFI SYSTEM Operation System Circuit ...
Page 121: ...FUEL SYSTEM Fuel Pump EFI SYSTEM Fuel System Fuel Pump FI 15 ...
Page 141: ...Fuel Tank and Lines COMPONENTS EFI SYSTEM Fuel System Fuel Tank and Lines FI 35 ...
Page 172: ...EXHAUST SYSTEM EXHAUST SYSTEM REPAIR INSTRUCTIONS EX 1 ...
Page 174: ...EMISSION CONTROL SYSTEMS EC 1 ...
Page 186: ...COOLING SYSTEM CO 1 ...
Page 205: ...LUBRICATION SYSTEM LUBRICATION SYSTEM Description Operation LU 1 ...
Page 224: ...IGNITION SYSTEM IG 1 ...
Page 237: ...SERVICE SPECIFICATIONS IG 14 IGNITION SYSTEM ServiceSpecifications ...
Page 238: ...ENGINE TROUBLESHOOTING TR 1 ...