7
•
Maintenance and Service
Page 180
Integral Fraction Collector FT (VF-F20-A) Operating Manual
4. Check if the needle unit is positioned correctly:
Move the lock pin slightly upward. If the lock pin and the vial pusher
can move up and down easily, the needle unit sits correctly in place.
5. Reinstall the needle capillary. See
Replacing the Needle Capillary
(
page 172)
.
6. Install the front plate. See
page 155)
.
7. Power on the device. Close the compartment doors and the device
will run initialization automatically. Make sure no errors or warnings
are reported in the Audit trail.
Summary of Contents for VF-F20-A
Page 4: ...Contacting Us Page 4 Integral Fraction Collector FT VF F20 A Operating Manual ...
Page 17: ...1 Using this Manual Integral Fraction Collector FT VF F20 A Operating Manual Page 17 ...
Page 31: ...2 Safety Integral Fraction Collector FT VF F20 A Operating Manual Page 31 ...
Page 48: ...3 Device Overview Page 48 Integral Fraction Collector FT VF F20 A Operating Manual ...
Page 215: ...8 Troubleshooting Integral Fraction Collector FT VF F20 A Operating Manual Page 215 ...
Page 221: ...9 Specifications Integral Fraction Collector FT VF F20 A Operating Manual Page 221 ...
Page 236: ...12 Index Page 236 Integral Fraction Collector FT VF F20 A Operating Manual 12 Index ...