Servicing
DMC PMT Cooler and Reaction Chamber Replacement
Thermo Scientific
42iQLS Instruction Manual
7-33
Figure 7–35.
Photo Reaction Chamber Cleaning, Hardware
6.
Pull reaction chamber outwards.
Equipment Damage
Some internal components can be damaged by small
amounts of static electricity. A properly grounded antistatic wrist strap
must be worn while handling an internal component.
▲
7.
To reinstall reaction chamber, follow previous steps in reverse, making
sure to back fill the cooler with dry air or nitrogen prior to installing
reaction chamber.
8.
Reinstall the measurement bench. Refer to
Figure 7–34
and
Figure 7–
41
.
Summary of Contents for 42iQLS
Page 1: ...42iQLS Instruction Manual Low Source NO NO2 NOx Analyzer 117436 00 1Sep2019 ...
Page 2: ......
Page 18: ......
Page 34: ...Operation Instrument Display 3 8 42iQLS Instruction Manual Thermo Scientific ...
Page 192: ......
Page 296: ......
Page 304: ......
Page 316: ......
Page 317: ......