Calibration
Pre-Calibration
4-8
42iQLS Instruction Manual
Thermo Scientific
F
+
F
V
=
t
NO
O
RC
R
7.
Verify that t
R
< 2 minutes. If not, select a reaction chamber with a
smaller V
RC
.
8.
Compute the diluent air flow rate as:
F
-
F
-
F
=
F
NO
O
T
D
9.
If F
O
turns out to be impractical for the desired system, select a reaction
chamber having a different V
RC
and recompute F
D
and F
O
.
Perform the following pre-calibration procedure before calibrating the
42iQLS. For detailed information about the menu parameters and the
icons used in these procedures, see the “
Operation
” chapter.
Note
The calibration and calibration check duration times should be long
enough to account for the transition (purge) process when switching from
sample to zero and from zero to span. This transition time is the time
required to purge the existing air.
▲
Note
Depending on the plumbing configuration and the instrument, data
from approximately the first minute of a zero calibration or check should
be disregarded because of residual sample air. Also, data from
approximately the first minute of a span calibration or check should be
disregarded because the span is mixing with the residual zero air.
▲
1.
Allow the instrument to warm up and stabilize.
2.
Be sure the ozonator is enabled. If the ozonator is disabled:
a.
From the Home screen choose
Settings>Instrument Settings
.
b.
Press
Ozonator Supply
to toggle the ozonator to show
Enabled
.
Pre-Calibration
Summary of Contents for 42iQLS
Page 1: ...42iQLS Instruction Manual Low Source NO NO2 NOx Analyzer 117436 00 1Sep2019 ...
Page 2: ......
Page 18: ......
Page 34: ...Operation Instrument Display 3 8 42iQLS Instruction Manual Thermo Scientific ...
Page 192: ......
Page 296: ......
Page 304: ......
Page 316: ......
Page 317: ......