Installation and Setup
Mounting Options
2-4
42iQLS Instruction Manual
Thermo Scientific
Mounting in a rack includes removing the front panel and installing ears
and handles.
Equipment required:
Phillips drive, #2
1.
Start by gripping from the top corners of the front panel and pull
outwards.
Figure 2–3.
Removing the Front Panel
2.
Unfasten the four 8-32 x 3/16-inch pan head screws.
3.
Slide ears outwards.
4.
Use the same four 8-32 x 3/16-inch pan head screws to secure it.
5.
Install the handles with the four 8-32 x 3/16-inch flat head screws.
Rack Mount
Summary of Contents for 42iQLS
Page 1: ...42iQLS Instruction Manual Low Source NO NO2 NOx Analyzer 117436 00 1Sep2019 ...
Page 2: ......
Page 18: ......
Page 34: ...Operation Instrument Display 3 8 42iQLS Instruction Manual Thermo Scientific ...
Page 192: ......
Page 296: ......
Page 304: ......
Page 316: ......
Page 317: ......