Maintenance
Capillaries Inspection and Replacement
5-4
42iQLS Instruction Manual
Thermo Scientific
2.
Remove the fitting(s) from the reaction chamber body using a 5/8-inch
wrench being careful not to lose the ferrule or o-ring.
3.
Remove the glass capillaries, ferrule, and o-ring. Inspect o-ring for cuts
or abrasion, and replace as necessary.
4.
Check capillary for particulate deposits. Clean or replace as necessary.
5.
Replace capillary in reaction chamber body, making sure the o-ring is
around the capillary before inserting it into the body.
6.
Replace fitting. Note that the fitting should be tightened slightly more
than hand tight.
7.
Reconnect tubing to top of fittings, being careful to insert ferrule and
o-ring properly, and tighten knurled nut finger tight.
8.
Re-install the cover.
9.
Connect the power cord and turn the instrument ON.
Summary of Contents for 42iQLS
Page 1: ...42iQLS Instruction Manual Low Source NO NO2 NOx Analyzer 117436 00 1Sep2019 ...
Page 2: ......
Page 18: ......
Page 34: ...Operation Instrument Display 3 8 42iQLS Instruction Manual Thermo Scientific ...
Page 192: ......
Page 296: ......
Page 304: ......
Page 316: ......
Page 317: ......