
2 User Manual
General Inspection
1. Inspect the shipment for damage.
Keep the shipping box and cushioning material until the contents of the shipment
have been checked for completeness and the instrument has passed both electrical
and mechanical tests.
The shipper or carrier shall be liable for the damage to instrument resulting from
shipment.
Teledyne Test Tools
would not be responsible for free maintenance /
rework or replacement of the unit.
2. Inspect the instrument.
In case of any damage, or defect, or failure, notify your
Teledyne Test Tools
sales
representative.
3. Check the Accessories
Please check the accessories according to the packing lists. If the accessories are
incomplete or damaged, please contact your
Teledyne Test Tools
sales
representative.
Summary of Contents for T3DSO1000
Page 1: ...User Manual T3DSO1000 T3DSO1000A Series Digital Oscilloscope...
Page 62: ...44 User Manual Figure 16 x Interpolation Figure 17 Sinx x Interpolation...
Page 90: ...72 User Manual Figure 32 Relative Window Trigger...
Page 92: ...74 User Manual Figure 33 Interval Trigger...
Page 98: ...80 User Manual Universal Knob to select the desired value Figure 37 Pattern Trigger...
Page 118: ...100 User Manual Figure 50 UART Trigger...
Page 145: ...User Manual 127 function output Figure 63 Square Root...
Page 205: ...User Manual 187 Figure 100 Option Information...