OPERATION
81
5.
Connect the master and slave unit in parallel as
shown above.
6.
Reattach the terminal covers.
Page 47
Note
Ensure the load cables have sufficient
current capacity.
Page 44
Re-attach the Protection dummy plug when not in
use.
Master-Slave Parallel Operation
Master-Slave
Configuration
Before using the power supplies in parallel, the
master and slave units need to be configured.
Steps
1.
Configure the OVP and OCP
settings for the master unit.
Page 60
2.
For each unit, hold the Function
key while turning the power on to
enter the power on configuration
settings.
3.
Configure F-93 (Master/Slave)
setting for each master/slave unit.
Page 120
Unit
F-93
Master (with 1 slave in parallel)
1
Master (with 2 slaves in parallel)
2
Slave unit (parallel slave)
3
4.
Cycle the power on the units (reset the power).
Summary of Contents for Keithley 2260B Series
Page 14: ...2260B Series User Manual 10 Considerations 33 Grounding 36 ...
Page 43: ...OPERATION 39 Remove Test Sequence 99 Test Sequence Error Messages 100 ...
Page 52: ...2260B Series User Manual 48 Removal Reverse the procedure to remove the terminal covers ...
Page 111: ...CONFIGURATION 107 Note Power On and Calibration settings can only be set during power up ...