■
on page 184.)
g. Test all channels:
Repeat substeps 2.a through 2.f for all four channels.
h.
If testing <4 GHz models, set the DC Calibration generator to drive a
load impedance of 1 MΩ. Repeat substeps 2.a through 2.g with the
instruments termination set to 1 MΩ.
3. Disconnect the hookup:
a. Set the generator output to 0 V
.
b.
Disconnect the equipment from the generator output and the input
connector of the channel last tested.
Performance verification (MSO/DPO70000C, MSO/DPO70000DX, and DPO7000C series)
MSO70000C/DX, DPO70000C/DX, DPO7000C, MSO5000/B, DPO5000/B Series
187
Summary of Contents for DPO5000 Series
Page 2: ......
Page 6: ......
Page 352: ...Index 340 MSO70000C DX DPO70000C DX DPO7000C MSO5000 B DPO5000 B Series...