8. LOAD HANDLING SYSTEM
- 145 -
Fig. 8.16
Side Roller
Fig. 8.17
(8) Extend the lift cylinder rod so that the inner
channel bottom projects the upper section of the
carriage.
(9) Bring the truck close to the carriage side so that
each roller enters inside of the outer channel.
(10) Contract the lift cylinder rod to lower the inner
channels gradually. Place each roller of the
carriage into the inner channels.
(11) Engage the chain with the sheave and connect
the chain and anchor through the joint link.
(12) Adjust the height of the carriage. (See 8.2.2.)
Groove for balls
Summary of Contents for FB10-7
Page 2: ......
Page 4: ...No SEB 81BBE...
Page 8: ...No SEB 81BBE...
Page 9: ...No SEB 81BBE Fig 1 Overall Dimensions Unit mm in...
Page 10: ...No SEB 81BBE...
Page 28: ...1 BATTERY AND CHARGER 16 NOTE...
Page 30: ...2 MOTORS 18 DRIVE UNIT Fig 2 1 Drive Motor Installation DRIVE AXLE DRIVE MOTOR...
Page 42: ...3 CONTROL SYSTEM 30 Fig 3 2 Inverter Assembly 1 0 to 2 5 ton Trucks...
Page 43: ...31 3 CONTROL SYSTEM Fig 3 3 Inverter Assembly 3 0 to 3 5 ton Trucks...
Page 44: ...3 CONTROL SYSTEM 32 Fig 3 4 Controller Wiring 1 0 to 2 5 ton Trucks...
Page 45: ...33 3 CONTROL SYSTEM Fig 3 5 Controller Wiring 3 0 to 3 5 ton Trucks...
Page 133: ...7 HYDRAULIC SYSTEM 121 Fig 7 27 Remove the oil seal from the front cover...
Page 160: ...8 LOAD HANDLING SYSTEM 148 NOTE...